Laywright runs a flooring company from the slab up. Every scan, probe and pull becomes proof, and every problem under the floor becomes a priced change order.
The floor is your company. Tap a layer or a label to open it.
Teal = within limit · Amber = near the limit · Red = overRH = relative humidity
Drag to turn · scroll to go deeperDrag to turn · tap a layer to open
05 Wear layer · protects everything
Money
Retainage, change orders and lien deadlines across every job.
At risk right now
Retainage held (released later)$33,781.50On 3 commercial jobs. Utah caps retainage at 5% on nonresidential work (13-8-5).
Larkspur Market$14,372.50
5% of $287,450.00 billed so far
Granger & Stoll Offices$13,445.00
5% of $268,900.00 · job complete, release pending
Summit Ridge Hotel$5,964.00
5% of $119,280.00 billed so far
Deadlines Utah rules, tracked per job
Preliminary noticeLarkspur Market · File by Fri 20 Nov · 2 daysLegal deadline Sun 22 Nov · 20 days from first work on 2 Nov (38-1a-501)falls on a Sunday · file by Fri 20 Nov (a weekend deadline rolls to Mon 23 Nov, 68-3-7)
2days
Retainage releaseGranger & Stoll · window ends 14 Dec45 days after the latest of final billing, final acceptance, occupancy, or final pay quantities (30 Oct) · 13-8-5
26days
Lien deadlineGranger & Stoll · 21 Apr 2027180 days from completion on 23 Oct (38-1a-502)
154days
Change orders waiting $18,090.00
CO-07
Floor prep · Larkspur MarketDrafted from the Area 4 laser scan · sent 14 Nov
$6,840.00
CO-02
Moisture mitigation · Summit RidgeApproved by phone · not signed yet
$11,250.00
04 Finish · what the client sees
Jobs
Every floor in progress, by material, area and percent laid.
3jobs on the floor today
59,400sq ft in progress
$1.156Munder contract on them
Field tools for the finish
Larkspur Market$412,600.00
Porcelain 24×48LVTGrocery · Area 3 of 7
18,400 sq ft62% laid
Area 3 waiting on GC sign-off · CO-07 unsigned
Summit Ridge Hotel$596,400.00
Carpet tilePorcelainHospitality · Level 2–3
31,200 sq ft18% laid
Flood test 17 h 40 min of 24 h · CO-02 not signed
Aspen Grove Residences$147,000.00
Solid white oak · 5 in plankBuilder · residential
9,800 sq ft55% laid
Acclimation ready to install
Granger & Stoll Offices$268,900.00
LVTCarpet tileOffice
22,600 sq ftComplete · retainage pending
Retainage release 14 Dec · 2 closeout items open
03 Setting bed · what holds it together
Crew
Who's where today, what they're certified for, what they're owed, and what OSHA requires for them.
10people on the crew
3jobs staffed today
2certified tile installers
On site right now 6 of the 10
HR
Héctor RuizCertified Tile Installer
Larkspur Area 3
MV
Marisol VegaLead installer · LVT
Larkspur Area 2
KA
Kalani AkanaHelper
Larkspur Area 3
TN
Tuan NguyenTile setter
Respirator 27 of 30 days Exam booked Fri 20 Nov
AW
Andre WilsonCarpet tile
Summit Ridge Level 3
DP
Dale PetersenHardwood
Aspen Grove Bldg C
NTCA Five Star 2 of 3 tile setters certified · 67%
Commercial work · at least 10%Crew mix meetsResidential work · at least 30%Crew mix meets
Counts Certified Tile Installers and DOL-approved setters; helpers excluded. The program also requires $150k residential / $500k commercial annual volume.
Silica, handled on the crew's phone
Wet saws and the Table 1 controls are checked off each day. Anyone who wears a respirator 30 or more days a year needs a medical exam, so Tuan's exam is booked for Fri 20 Nov, before day 30 (Mon 23 Nov).
OSHA 29 CFR 1926.1153
Piece-rate overtime, worked out for you
For crews on piece rate, each hour over 40 earns an extra half of the regular rate, and the regular rate is the week's piece pay divided by the hours worked.
29 CFR 778.111
02 Membrane · the proof underneath
Records
Every job builds its own defense file while the crew works, so a callback or a claim meets proof instead of a shrug.
Defense file · Larkspur Market Auto-built
18laser scans
41probe readings
27coverage pulls
9joint checks
312cartons scanned
1,284photos
Closeout · Granger & Stoll 4 of 6
67%
As-built floor planDone
Maintenance guideDone
Warranty registeredDone
Final lien waiverDone
Attic stock deliveredOpen
GC punch-list sign-offOpen
Warranty clocks start themselves
LATICRETE's 10-year system warranty needs a written claim within 30 days of discovery. Laywright starts that clock the day a problem is logged.
LATICRETE DS 230.10
01 Slab · where every floor starts
Start gate
Larkspur Market · Area 3 · sales floor · 24×48 porcelain · 4,800 sq ft. Nothing gets laid until all five are green. Waiting on you or the GC shows in amber.
Prior-trade damage2 photos sent to the GCPass
GC sign-offWaiting on Halvorsen ReedWaiting on GC
Field kit · on the
Laser flatness
Scan the slab before a tile goes down. Anything over the limit becomes a priced change order with the proof attached.
Flatness over 10 ftLimit 1/8″
3/32″Pass
Flatness over 24 inLimit 1/16″
1/32″Pass
Within limitNear the limitOver the limit
Flatness over 10 ftLimit 1/8″
3/16″Over
Flatness over 24 inLimit 1/16″
3/32″Over
Within limitNear the limitOver the limit
CO-07 · drafted from this scan1,140 sq ft over the limit along column line C × $6.00 per sq ft to grind and patch$6,840.00Scan, heat map and photos attached. Sent to Halvorsen Reed on 14 Nov, before any prep work started.
Why this pays for itself
The tile sets the tolerance: ANSI A108.02 allows 1/8″ in 10 ft for tile with any edge 15″ or longer. A dated scan, sent with the change order before any prep starts, records the slab exactly as it was handed over, so the prep is priced up front instead of argued about after the tile is down.
ANSI A108.02
Field kit · in the
Moisture probes
Relative humidity inside the slab, logged the way ASTM F2170 requires and checked against the product's own limit.
7probes for 4,800 sq ft
1.6″deep · 40% of a 4″ slab
24 hto equilibrate before reading
Readings · 18 Nov, 7:42 am 85% limit (product data sheet)
P178%
P281%
P376%
P483%
P579%
P680%
P777%
85% limit85%
The limit comes from the product's data sheet (85% in this example). P4 sits near the exterior wall and is flagged for a retest before the membrane goes down.
The test the standard actually asks for
Three probes for the first 1,000 sq ft and one more for each additional 1,000, set at 40% of the slab's depth when it dries from the top, and read after 24 hours. Laywright counts the probes, times the wait and stores every reading.
ASTM F2170
Field kit · under the
Coverage pull
Pull a tile, photograph the back, and Laywright measures how much of it the mortar actually touched.
91.7%average
Pull 1 · grid C-492%
Pull 2 · grid D-694%
Pull 3 · grid B-289%
Corners fully supportedYes
Interior dry floor · limit 80%Pass
The rule behind it
ANSI A108.5 calls for at least 80% average mortar contact, and 95% for showers and exteriors, judged by pulling at least three tiles. TCNA guidance adds 95% for other wet areas and natural stone. Hollow tile is among the most common tile complaints, and this record shows the coverage was there when it went down.
ANSI A108.5 · TCNA guidance
Field kit · through the
Movement joints
The joints that keep tile from tenting, laid out by the rule and checked off by the crew.
Perimeter joint, ¼″ minimumDoneField joints laid out at 20 ft5Placed and photographed4 of 5Still openLine at 40 ft
The rule behind it
Indoors, a field joint every 20 to 25 ft in each direction; every 8 to 12 ft outdoors or where the floor sits in direct sun, plus joints at the perimeter and wherever the plane changes. Missing joints are a top cause of tented tile.
TCNA EJ171
Field kit · before the
Lot scan & acclimation
Every carton scanned on delivery, every plank checked before it goes down. Mixed lots get caught on the pallet, not on the floor.
47cartons scanned · Larkspur
46on lot 2241-B, shade 03
1on 2241-C, set aside
Shade and size vary between production lots, so tile is ordered and laid from one lot. The odd carton never reaches the floor.
Acclimation · Aspen Grove Solid white oak · 5″ plank
Subfloor moisture8.4%Flooring moisture7.1%Difference · limit 2% for plank 3″ and wider1.3%
Ready to install
The rule behind it
For solid wood, the subfloor should be no more than 4% wetter than strip flooring under 3″ wide, and no more than 2% wetter than plank 3″ and wider.
NWFA Installation Guidelines
Field kit · on the
Flood test
Every shower pan proven watertight before tile covers it, with the clock and the photos to show it.
17:40of 24 h
Room 214 · Summit Ridge HotelFilled 17 Nov at 2:20 pm · level steady · start photo loggedPasses at 2:20 pm today if the level holds
Level 2 shower pans 4 passed · 1 running · 19 to go
The rule behind it
A flood test runs for at least 24 hours and no more than 72. Laywright starts the clock when the pan is filled and asks for the closing photo when it's done.
ASTM D5957
Studio Owner only · applies to every seat
Built the way you lay floors.
Choose your trades and tools, set the standards your crews work to, and decide who approves what. Every change flows to the Office and Crew seats.
Studio14 of 14 tools onAll changes saved
Morning brief Wed 18 Nov · 8:00 am
Good morning, Garrett.
Your managers, every job’s money and what needs you, before the trucks roll.
The 3D view needs WebGL; everything else works.Kestrel Floor Co. · Wed 18 Nov 2026 · sample figures